Looking for a Tutor Near You?

Post Learning Requirement »
x
x

Direction

x

Ask a Question

x

Hire a Tutor

Presentation On Concrete Manufacturing

Loading...

Published in: Engineering
120 Views

Finishing/curing process of concrete. Concrete technology

Vamsi P / Dubai

6 years of teaching experience

Qualification: Civil Engineering

Teaches: Chess, Arabic, English, French, Spanish, Accounts, Chemistry, Physics, Maths, Science, Mathematics, English Language

Contact this Tutor
  1. Concrete technology Finishing Vamsi Putta AUD 8081
  2. Finishing of the concrete surface is done after compaction to obtain true, uniform and smooth surface. Things you need to figure out before the finishing process starts... What type of surface is needed? 2. 3. 4. 5. 6. Interior or exterior Slab uses Non slip or smooth Sealed for sanitary reasons Excessive water washing Decorative
  3. Finishing of concrete Various steps involved Screeding Floating Trowelling
  4. Screeding Screeding - Striking off excess concrete using a straight edge. (Consolidating)(uniform plastic mass) Standard timings for Finishing This can take 20 minutes or 4 hours depending on the temperature, humidity and how hard the wind is blowing. After the bleed water is al gone, you can get out your steel finishing trowel and put on t final touches. You will notice the s I trowel is not perfectly flat. Straight edge
  5. Floating Floating - Removes the irregularities left after screeding, firmly embeds the large aggregate particles, done using wooden floats. Floating gives a medium non- slip surface, good for concrete which is constantly exposed to outside weather and general use. (1.5 m long and 20 cm wide) (handle 5 m long) (Wood float or metal float — rougher finish???) Wooden Darby A *'Oden daroy used on to Wood float Bull floa
  6. Power trowel Trowelling Trowelling - To obtain very smooth and highly wear resistance surface is done using a steel trowel. (trowel is 25 to 50 cm long, 8 to 12 cm wide) Troweling — smooth surface — brings the cement paste to the top (easy clean up) (slippery when wet)(sanitary conditions)(after all excess water has evaporated) Power trowel Steel trowel
  7. Summary Finishing is done after compaction, to obtain level and smooth surface. Steps involved are Screeding, Floating followed by Trowelling. Spreading of dry cement on wet surfaces should be avoided as it causes weaker surfaces, cracks and blisters. Brooming — for a rougher finish (damp, stiff — bristled broom)(Outside areas) Latest trowelling technology
  8. Thank you